Half Yearly Report and Accounts
Released
Released
Announcement PDF
ABN 27 648 890 126
INTERIM FINANCIAL REPORT
FOR THE HALF-YEAR ENDED
31 December 2023
INTERIM FINANCIAL REPORT
for the half-year ended 31 December 2023
CORPORATE DIRECTORY ............................................................................................................... 1
DIRECTORS’ REPORT ...................................................................................................................... 2
AUDITOR’S INDEPENDENCE DECLARATION .............................................................................. 12
INDEPENDENT AUDITOR’S REVIEW REPORT ............................................................................ 13
DIRECTORS’ DECLARATION .......................................................................................... 15
CONDENSED CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER
COMPREHENSIVE INCOME ........................................................................................................... 16
CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION ................................... 17
CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY .................................... 18
CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS ................................................. 19
NOTES TO THE INTERIM CONSOLIDATED FINANCIAL STATEMENTS .................................... 20
CORPORATE DIRECTORY
DIRECTORS
AUDITORS
Jeremy Robinson (Executive Chairman)
Matthew Freedman (Non-Executive Director)
James Bahen (Non-Executive Director)
Leo Horn (Non-Executive Director)
BDO Audit (WA) Pty Ltd
Level 9, Mia Yellagonga Tower 2, 5 Spring Street
Perth WA 6000
COMPANY SECRETARIES
Automic Share Registry
Level 5, 191 St Georges Terrace
Perth WA 6000
James Bahen
Robbie Featherby
SHARE REGISTRY
Level 1, 338 Barker Road
SUBIACO WA 6008
1300 288 664 (Local)
+61 2 9698 5414 (International)
www.automic.com.au
POSTAL ADDRESS
BANKER
REGISTERED OFFICE
Level 1, 338 Barker Road
SUBIACO WA 6008
PRINCIPAL PLACE OF BUSINESS
Level 1, 338 Barker Road
SUBIACO WA 6008
CONTACT INFORMATION
Tel: + (08) 6143 6720
info@cosmosx.com.au
National Australia Bank
Level 1 / 1238 Hay Street
West Perth WA 6005
SECURITIES EXCHANGE LISTING
Australian Securities Exchange (ASX)
Level 40, Central Park
152-158 St George's Terrace
Perth WA 6000
ASX CODE: C1X
COSMOS EXPLORATION LIMITED | 2023 INTERIM FINANCIAL REPORT
Page 1
DIRECTORS’ REPORT
The directors of Cosmos Exploration Limited (ASX:C1X) and it subsidiary (“the Group”) for the half-year
ended 31 December 2023 (Period) and the auditor’s review report thereon. The Interim Financial Report
has been prepared in accordance with AASB 134 Interim Financial Reporting.
DIRECTORS
The names and particulars of the directors of the Company in office during the Period and until the date of
this report are as follows. Directors were in office for the entire Period unless otherwise stated.
Director
Jeremy Robinson
Matthew Freedman
James Bahen
Leo Horn
Position
Executive Chairman
Non-Executive Director
Non-Executive Director
Non-Executive Director
The names of the secretaries in office at any time during or since the end of the period are:
Company Secretaries
James Bahen
Robbie Featherby
Position
Company Secretary
Company Secretary
OPERATING RESULTS
The Company has incurred a net loss after tax for the half-year ended 31 December 2023 of $2,205,625
(31 December 2022: $911,057).
PRINCIPAL ACTIVITIES
Cosmos Exploration Limited is a mineral exploration company focussed on discovery. Cosmos Exploration
project portfolio continues to evolve as it pursues strategic land holdings in geological terranes and
provinces with proven or emerging potential for the discovery of significant mineral deposits.
REVIEW OF OPERATIONS
Corvette Far East Lithium Project
Cosmos' Corvette Far East and Lasalle Exploration Projects are situated within the James Bay lithium district
of Quebec, Canada. These projects are located on the same trend as the Patriot Battery Metals Inc (ASX:
PMT) Corvette Project, which currently hosts the largest lithium pegmatite resource in the Americas1.
The Corvette Far East Project is interpreted to be a "dismembered" section of the same greenstone belt
that hosts Patriot's Corvette Project. It is also centrally located between other significant lithium projects in
the James Bay district, including the Trieste pegmatite discoveries by Loyal Lithium Limited (ASX: LLI),
Brunswick Exploration Inc.'s (TSX-V: BRW) Mirage Project, and Midland Exploration Inc.'s (“Midland”) (TSXV: MD) Galinée Project, located 25km to the south of Cosmos’ Lasalle Project (Figure 1).
Midland's discovery at Galinée, which is part of their joint venture with Rio Tinto Exploration Canada Inc.,
and Patriot’s CV5 discovery at its Corvette Project, further validate the potential of the James Bay region to
COSMOS EXPLORATION LIMITED | 2023 INTERIM FINANCIAL REPORT
Page 2
host world-class hard rock lithium deposits, reinforcing the strategic position of Cosmos' holdings in the
heart of one of the world’s most prospective lithium districts in the world.
Figure 1: Simplified bedrock geology map of the James Bay district showing the location of the Corvette Far
East and Lasalle Projects held by Cosmos in relation to the CV5, Mirage, Trieste and Galinée discoveries.
Patriot Battery Metals Inc’s (ASX:PMT) announcement dated 31/07/23, Inferred Resource of 109.2Mt at 1.42% Li2O and 160ppm
Ta2O5).
2
TSX-V announcement TSX-V: BRW, 21 August 2023
3
ASX announcement ASX:LLI, 16 August 2023
1
Extensive regional fires in June and July delayed the start of field activities during the quarter. Maiden field
activities commenced on 11 August 2023 following the lifting of state-imposed fire-related restrictions.
A total of 19 days of on-ground fieldwork were completed between 11 and 25 August and 12 and 17
September 2023 at the Corvette Far East and Lasalle Projects. A total of 512 rock chip samples and 122
biogeochemistry samples were collected during both these helicopter supported field programs. An airborne
aeromagnetic/radiometric survey was flown in November infilling the previous 100m spaced flight lines to
50m on the western side of the Corvette Far East Project tenure (Figure 2).
Initial field activities at the projects involved investigating desktop hyperspectral targets within the tenure.
Desktop spectral anomalies were generated by fingerprinting the Lithium Spectral Index over Patriot’s CV5
mineralised pegmatite outcrop using data processed from Sentinel, Aster and Synthetic Aperture Radar
(SAR) and applying the index to Cosmos's tenure. The Lithium Spectral Index is designed to detect lithiumbearing minerals like spodumene. However, upon field checking, many hyperspectral targets were over
areas of thick vegetation and glacial till producing ambiguous results.
Traditional rock chip sampling of pegmatite outcrops/boulders with pXRF analysis was the most successful
on-ground vectoring tool utilised in identifying the Polaris fractionated pegmatites.
Vectoring towards prospective areas was achieved by examining element distributions and element ratios
(e.g., K/Rb) analysing feldspars and micas from pegmatite samples with the company’s portable XRF unit
(pXRF) and LIBs analyser.
COSMOS EXPLORATION LIMITED | 2023 INTERIM FINANCIAL REPORT
Page 3
Figure 2: Corvette Far East Project highlighting the Airborne magnetic and Radiometric Survey Area (pink
outline). The survey infilled previous 100m spaced flight lines to 50m. Background 100m spaced magnetic
image (TMIRTP HP500agc) showing pegmatite outcrop and boulders confirmed in the field and
biogeochemistry survey area. Note much better exposures on the western side than the eastern side that is
largely covered with glacial material.
To further substantiate the Polaris findings, whole rock assay data was plotted from the first 71 rock chip
samples received for the quarter confirming the field pXRF results and observations.
Results were comparable, with whole rock assay plots of K/Rb vs Cs indicating significant fractionation
trends and spatially plotting, vectoring towards the Polaris outcropping pegmatite (Figure 3 & 4).
X-Ray Diffraction (XRD) mineralogy results of sample H909418 further support the evidence that the Polaris
pegmatite is highly fractionated, identifying predominantly an unusually lithium-caesium-enriched beryl
mineral variety in addition to the lithium ore mineral petalite in lessor quantities.
Both minerals are known to occur in a highly fractionated pegmatites in very close proximity to and
overlapping the spodumene field (Figure 3).
COSMOS EXPLORATION LIMITED | 2023 INTERIM FINANCIAL REPORT
Page 4
Figure 3: K/Rb vs Ce whole rock assay plot for CFE pegmatite samples indicating fractionation towards more
highly prospective samples in the “Spodumene Field”. The Spodumene Field represents rocks that have likely
undergone high degrees of fractionation which can also produce minerals other than spodumene. This ratio
is used as proxy for prospective spodumene bearing pegmatites and not a sole discriminate for the presence
of spodumene.
Figure 4: Pegmatite outcrop trends confirmed in the field (blue dash), interpreted E-W structural trends
(black dash) and K/Rb ratio from whole rock assays highlighting the 3 fractionated trends toward the high
priority Polaris demagnetised target area, location of XRD Polaris sample H909418 and Biogeochemistry
survey area over airborne magnetics (TMIRTP HP500agc)
Although the lithium mineral spodumene was not identified, the chemical analyses of the pegmatites at the
Polaris prospect have revealed the presence of pathfinder metals and ratios indicative of highly fractionated
pegmatites, confirming that the Polaris prospect is highly prospective for lithium. The data also suggest
that the spodumene zone is likely proximal to the Polaris outcrop, potentially down-dip or along strike to
the south-west, and represents a compelling drill target.
COSMOS EXPLORATION LIMITED | 2023 INTERIM FINANCIAL REPORT
Page 5
The magnetic low in geophysical imagery supports a south-westerly strike to the Polaris pegmatite, as
pegmatites are typically non-magnetic and remarkably subdued against mafic rocks, which tend to be
moderate to high responses in magnetic datasets.
During September, Cosmos trialled biogeochemical sampling to test areas interpreted to be affected by
thicker moist ground cover or transported overburden, where conventional soil and rock chipping is largely
ineffective. The technique involved collecting bark from spruce trees being a densely populated genus of
pine tree evenly distributed throughout the tenure.
A total of 122 biogeochemistry samples were taken during the second on-ground exploration phase in
September on north-south orientated lines spaced 200m apart and 50m sample spacing. The orientation
survey was trialled over the highly fractionated pegmatites at the Polaris prospect and extended 1.9km to
the south-west along the magnetic low, interpreted to be the continuation of the Polaris pegmatite.
Due to the current poor market conditions and pricing for lithium, the Company has decided not to proceed
with the proposed drill program at Corvette Far East during the current winter.
Lasalle Lithium Project
Cosmos collected 62 rock chips from pegmatite boulders and three from pegmatite outcrops of the 77
samples collected during the quarter. Highly fractionated tourmaline-bearing pegmatite boulders identified
in the central north of the Project indicate increasing prospectivity, providing that source rocks are proximal
(Figure 5).
Figure 5: Interpreted bedrock geology at the Lasalle Project showing the location of pegmatite boulders, recently
identified gold mineralisation in relation to known gold occurrences.
Mafic rock chip samples were collected on an ad hoc basis and analysed for gold. A gossanous volcanic
mafic (greenstone) rock chip was collected during the quarter with extensive boxwork textures. Assays
received returned high-grade gold values of 42.4 g/t Au for sample H909193 (Figures 5 & 6).
These high-grade gold rock chips were found in a broad area of red iron-stained soils, where the bedrock
is interpreted to be under thin cover. This area represents a new gold occurrence, separate from any
COSMOS EXPLORATION LIMITED | 2023 INTERIM FINANCIAL REPORT
Page 6
previously reported gold anomalies in the area (Figure 5). The finding enhances the Project's gold potential,
in addition to lithium.
Figure 6: Photo of sample H909193 of semi-massive sulphide and gossan in mafic volcanic rock. Assay received
in October returning 42.4 g/t Au.
Byro East Rare Earth and Nickel-Copper-PGE Project
During the reporting period assay results from the May-June field activities were received for rock chips
samples collected in and around the Dottyback and Leatherback prospects. These samples were collected
to ground-truth a portion of the 70 recognised rare earth single and multi-point soil geochemical anomalies
across the central four tenements, spanning an area of more than 600km2. Standout rock chip assay results
of up to 1.09% TREYO (BY23K360) were received, located at the northern end of the Leatherback magnetic
feature.
A review by leading expert Ken Collerson revealed that the Chondrite normalised plots for selected Byro
rock chips are significantly enriched in LREEs, and display similar levels of LREE and HREE enrichment to
those reported for carbonatites1 from classic alkaline terranes (eg Kola Peninsula in Finland and Russia) and
Mirima Hill (Kenya). The REE profiles of the Byro alkaline samples are several orders-of-magnitude more
REE enriched than of average crust which is shown for comparison. Also shown for comparison are LREE
enriched profiles of ocean island basalts (OIBs) which, like carbonatites are associated with mantle plumes.
Alkaline magmatism in the Byro region is inferred to be related to the impact of a plume associated with a
~1078-1070Ma mantle plume of the Warakurna Large Igneous Province.
1
Refer to Appendix in ASX: C1X announcement 15 August 2023
COSMOS EXPLORATION LIMITED | 2023 INTERIM FINANCIAL REPORT
Page 7
Figure 7 – Image showing the mixed acid TREO + Y 2O3 surface soil geochemistry and recent rock chip assays
coincident with a 3.5km long magnetic high (left, red-white colours) and gravity high (right, red-yellow colours)
geophysical anomalies at the Leatherback Prospect, potentially indicating the presence of a mafic to ultramafic
Alkaline-Carbonatite Complex.
Figure 8 – (left) Field photograph of weathered carbonatite rock chip sample BY23K0360 assaying 1.09 %
TREYO (22% NdPr) (right) Field photograph of weathered iron oxide rich pyroxenite or possible ferrocarbonatite
rock chip sample LRBY21 with assays returning 263 ppm Sc203 and 0.7% TREYO (30% NdPr).
Globally recognised expert Professor Ken Collerson was engaged to substantiate the findings and
determined that the Byro rock chip samples (e.g., BY23K060) were significantly enriched in LREE’s and
COSMOS EXPLORATION LIMITED | 2023 INTERIM FINANCIAL REPORT
Page 8
displayed similar levels of LREE and HREE enrichment to those reported for carbonatites from classic
alkaline terranes like the Kola Peninsula in Scandinavia and carbonatites from Mirima Hill, Kenya (Figure
9).
Figure 9 – In Chondrite normalised plots showing that the selected Byro rock chips (upper plot) are significantly
enriched in LREEs, and display similar levels of LREE and HREE enrichment to those reported for carbonatites 2
from classic alkaline terranes (eg Kola Peninsula in Finland and Russia) and Mirima Hill (Kenya). The REE profiles
of the Byro alkaline samples are several orders-of-magnitude more REE enriched than of average crust which is
shown for comparison. Also shown for comparison are LREE enriched profiles of ocean island basalts (OIBs)
which, like carbonatites are associated with mantle plumes. Alkaline magmatism in the Byro region is inferred to
be related to the impact of a plume associated with a ~1078-1070Ma mantle plume of the Warakurna Large
Igneous Province.
The validation of an alkaline-carbonatite complex at the Leatherback prospect provided enough confidence
for additional 2741 in-fill samples to be collected in September and October 2023 , in-filling the known 70
existing, single and multi-point REE and Ba-Sr-Nb-Ca-Ni-Cr-Mg anomalies previously collected on 320m x
80m over the Leatherback & Dottyback prospects and 450m x 450m over the remaining central tenements
to 160m x 80m and 160m x 160m, respectively (Figure 10).
2
Refer to Appendix in ASX: C1X announcement 15 August 2023
COSMOS EXPLORATION LIMITED | 2023 INTERIM FINANCIAL REPORT
Page 9
Field rock chipping followed in the months of October to December 2023 collecting a total of 375 rock chip
samples across the central four Byro East tenements (>600km2). 349 rock chips aimed to assess 21 of 70
REE-Ba-Sr-Nb-Ca-Ni-Cr-Mg geochemical soil anomalies with 26 samples taken from areas prospective for
magmatic Ni-Cu-PGE mineralisation (Figure 10).
All rock chips collected were analysed in the field with the Company’s portable X-ray fluorescence (pXRF)
before being submitted for multi-element sodium peroxide fusion digest. Assays were received in January
2024 outside of this reporting period.
Figure 10 – Image showing the locations of recent highly anomalous TREYO Rock Chip samples and Gravity
outlines overlain on the regional gridded Geochem and Magnetic imagery. This shows the scale of the Byro
East project to host REE type deposits associated with mafic to ultramafic Alkaline-Carbonatite Complex.
Competent Person Statement
This report's information related to Exploration Results is based on information and data compiled or
reviewed by Mr Kristian Hendricksen. Mr Hendricksen is an employee and shareholder of Cosmos Exploration
Limited (Cosmos) and is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM).
Mr Hendricksen has sufficient experience relevant to the style of mineralisation under consideration and to
the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore
Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves. Accordingly, Mr Hendricksen consents to the inclusion of the matters based on the
information compiled by him, in the form and context it appears.
The Company confirms that it is not aware of any new information or data that materially affects the
information in the relevant ASX releases. The form and context of the announcement have not materially
changed. This announcement has been authorised for release by the Board of Cosmos Exploration Ltd.
COSMOS EXPLORATION LIMITED | 2023 INTERIM FINANCIAL REPORT
Page 10
This Report contains information extracted from ASX market announcements reported in accordance with
the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves” (2012 JORC Code). Further details (including 2012 JORC Code reporting tables where applicable)
of exploration results referred to in this Interim Report can be found in the following announcements lodged
on the ASX:
31 January 2024
31 January 2024
31 October 2023
30 October 2023
5 October 2023
4 September 2023
15 August 2023
11 August 2023
26 July 2023
19 July 2023
Quarterly Activities/Appendix 5B Cash Flow Report
Rare Earth Trends Emerging at Byro East Project
Quarterly Activities/Appendix 5B Cash Flow Report
James Bay Lithium Projects – Exploration Update
Highly Fractionated Pegmatites Confirm Drill Target
Spodumene-bearing Pegmatite Discovered at Polaris
Significant Rare Earths Potential at Byro East, WA
Maiden Summer Lithium Exploration Program Commences
High-Priority Lithium target areas identified at Lasalle
Quarterly Activities/Appendix 5B Cash Flow Report
SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS
There were no other significant changes in the state of affairs of the Group other than as referred to
elsewhere in this consolidated half-year report and in the accounts and notes attached thereto.
CAPITAL MANAGEMENT
The Company has 57,475,000 fully paid ordinary shares on issue and $1,116,825 in cash as at the end of
the Period.
SIGNIFICANT EVENTS AFTER THE BALANCE DATE
At the time of this report there were no further events subsequent to the reporting date that required
disclosure.
AUDITOR’S INDEPENDENCE DECLARATION
A copy of the auditors’ independence declaration as required under Section 307C of the Corporations Act
2001 in relation to the review for the half-year is set out on page 12 of this report.
This report is presented in accordance with a resolution of the Board of Directors and is signed for and on
behalf of the directors pursuant to section 306(a) of the Corporations Act 2001, by:
Jeremy Robinson
Executive Chairman
Perth, Western Australia this 15th day of March 2024
COSMOS EXPLORATION LIMITED | 2023 INTERIM FINANCIAL REPORT
Page 11
Tel: +61 8 6382 4600
Fax: +61 8 6382 4601
www.bdo.com.au
Level 9
Mia Yellagonga Tower 2
5 Spring Street
Perth, WA 6000
PO Box 700 West Perth WA 6872
Australia
DECLARATION OF INDEPENDENCE BY JARRAD PRUE TO THE DIRECTORS OF COSMOS EXPLORATION
LIMITED
As lead auditor for the review of Cosmos Exploration Limited for the half-year ended 31 December
2023, I declare that, to the best of my knowledge and belief, there have been:
1.
No contraventions of the auditor independence requirements of the Corporations Act 2001 in
relation to the review; and
2.
No contraventions of any applicable code of professional conduct in relation to the review.
This declaration is in respect of Cosmos Exploration Limited and the entities it controlled during the
period.
Jarrad Prue
Director
BDO Audit (WA) Pty Ltd
Perth
15 March 2024
BDO Audit (WA) Pty Ltd ABN 79 112 284 787 is a member of a national association of independent entities which are all members of BDO Australia
Ltd ABN 77 050 110 275, an Australian company limited by guarantee. BDO Audit (WA) Pty Ltd and BDO Australia Ltd are members of BDO
International Ltd, a UK company limited by guarantee, and form part of the international BDO network of independent member firms. Liability
limited by a scheme approved under Professional Standards Legislation.
Tel: +61 8 6382 4600
Fax: +61 8 6382 4601
www.bdo.com.au
Level 9
Mia Yellagonga Tower 2
5 Spring Street
Perth, WA 6000
PO Box 700 West Perth WA 6872
Australia
INDEPENDENT AUDITOR'S REVIEW REPORT
To the members of Cosmos Exploration Limited
Report on the Half-Year Financial Report
Conclusion
We have reviewed the half-year financial report of Cosmos Exploration Limited (the Company) and its
subsidiaries (the Group), which comprises the consolidated statement of financial position as at 31
December 2023, the consolidated statement of profit or loss and other comprehensive income, the
consolidated statement of changes in equity and the consolidated statement of cash flows for the
half-year ended on that date, a summary of significant accounting policies and other explanatory
information, and the directors’ declaration.
Based on our review, which is not an audit, we have not become aware of any matter that makes us
believe that the accompanying half-year financial report of the Group does not comply with the
Corporations Act 2001 including:
i.
Giving a true and fair view of the Group’s financial position as at 31 December 2023 and of its
financial performance for the half-year ended on that date; and
ii.
Complying with Accounting Standard AASB 134 Interim Financial Reporting and the Corporations
Regulations 2001.
Basis for conclusion
We conducted our review in accordance with ASRE 2410 Review of a Financial Report Performed by the
Independent Auditor of the Entity. Our responsibilities are further described in the Auditor’s
Responsibilities for the Review of the Financial Report section of our report. We are independent of
the Company in accordance with the auditor independence requirements of the Corporations Act 2001
and the ethical requirements of the Accounting Professional and Ethical Standards Board’s APES 110
Code of Ethics for Professional Accountants (including Independence Standards) (the Code) that are
relevant to the audit of the annual financial report in Australia. We have also fulfilled our other ethical
responsibilities in accordance with the Code.
We confirm that the independence declaration required by the Corporations Act 2001 which has been
given to the directors of the Company, would be the same terms if given to the directors as at the time
of this auditor’s review report.
Material uncertainty relating to going concern
We draw attention to Note 1.2 in the financial report which describes the events and/or conditions which
give rise to the existence of a material uncertainty that may cast significant doubt about the Group’s
ability to continue as a going concern and therefore the Group may be unable to realise its assets and
discharge its liabilities in the normal course of business. Our conclusion is not modified in respect of
this matter.
BDO Audit (WA) Pty Ltd ABN 79 112 284 787 is a member of a national association of independent entities which are all members of BDO Australia
Ltd ABN 77 050 110 275, an Australian company limited by guarantee. BDO Audit (WA) Pty Ltd and BDO Australia Ltd are members of BDO
International Ltd, a UK company limited by guarantee, and form part of the international BDO network of independent member firms. Liability
limited by a scheme approved under Professional Standards Legislation.
Responsibility of the directors for the financial report
The directors of the company are responsible for the preparation of the half-year financial report that
gives a true and fair view in accordance with Australian Accounting Standards and the Corporations Act
2001 and for such internal control as the directors determine is necessary to enable the preparation of
the half-year financial report that is true and fair and is free from material misstatement, whether due
to fraud or error.
Auditor’s responsibility for the review of the financial report
Our responsibility is to express a conclusion on the half-year financial report based on our review. ASRE
2410 requires us to conclude whether we have become aware of any matter that makes us believe
that the half-year financial report is not in accordance with the Corporations Act 2001 including giving
a true and fair view of the Group’s financial position as at 31 December 2023 and its performance for
the half-year ended on that date, and complying with Accounting Standard AASB 134 Interim Financial
Reporting and the Corporations Regulations 2001.
A review of a half-year financial report consists of making enquiries, primarily of persons responsible
for financial and accounting matters, and applying analytical and other review procedures. A review is
substantially less in scope than an audit conducted in accordance with Australian Auditing Standards
and consequently does not enable us to obtain assurance that we would become aware of all significant
matters that might be identified in an audit. Accordingly, we do not express an audit opinion.
BDO Audit (WA) Pty Ltd
Jarrad Prue
Director
Perth, 15 March 2024
DIRECTORS’ DECLARATION
The directors declare that the financial statements and notes are in accordance with the Corporations Act
2001:
(a) Comply with Australian Accounting Standards AASB 134 Interim Financial Reporting and the
Corporations Regulations 2001, and other mandatory professional reporting requirements ;
(b) Give a true and fair view of the financial position of the entity as at 31 December 2023 and of its
performance for the period ended on that date.
In the directors’ opinion there are reasonable grounds to believe that Cosmos Exploration Limited will be
able to pay its debts as and when they become due and payable.
This declaration is made in accordance with a resolution of the directors made pursuant to section 305(a)
of the Corporations Act 2001.
For, and on behalf of, the Board of the Company,
Jeremy Robinson
Executive Chairman
Perth, Western Australia this 15th day of March 2024
COSMOS EXPLORATION LIMITED | 2023 INTERIM FINANCIAL REPORT
Page 15
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND
OTHER COMPREHENSIVE INCOME
for the half-year ended 31 December 2023
Note
Interest Income
Expenses
Corporate compliance costs
Accounting, Audit and Corporate fees
Directors' fees, salaries, superannuation, and consulting costs
Depreciation
Administration costs
Legal fees
Travel Expenses
Exploration expenditure expensed
Share based payment expensed
Total Expense
5
Income tax (benefit)/expense
Loss after tax from continuing operations
Items that maybe reclassified subsequently to profit or
loss
Exchange differences on translation of foreign operations
Total comprehensive loss net of tax for the Period
Basic and diluted loss per share (cents)
Half-Year
Ended
31 Dec 2023
$
Half-Year
Ended
31 Dec 2022
$
28,211
25,874
(44,065)
(74,576)
(340,825)
(16,056)
(198,452)
(6,096)
(1,147,456)
(406,310)
(2,205,625)
(25,036)
(61,399)
(158,680)
(5,906)
(52,952)
(29,292)
(333)
(498,183)
(105,150)
(911,057)
(2,205,625)
(911,057)
(13,541)
(2,219,166)
(911,057)
(4.01)
(2.60)
The Consolidated Statement of Profit or Loss and Other Comprehensive Income should be read in
conjunction with the accompanying notes, which form an integral part of the interim financial report.
COSMOS EXPLORATION LIMITED | 2023 INTERIM FINANCIAL REPORT
Page 16
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
as at 31 December 2023
Note
Current assets
Cash and cash equivalents
Trade and other receivables
Total current assets
Non-Current assets
Plant and Equipment
Exploration Assets
Total Non-Current assets
Total assets
As At
31 Dec 2023
$
As At
30 Jun 2023
$
1,116,825
89,535
1,206,360
2,559,244
82,925
2,642,169
67,327
6,132,206
6,199,533
7,405,893
83,383
6,
Share your feedback
Discover